Tuesday, January 1, 2013

Pedophile moving to Wenonah neighborhood

-->
Clarence J. Opheim molested 29 children, has been in treatment for 20 years


by Tesha M. Christensen

A renowned Level III sex offender is moving into the Wenonah neighborhood.
In March 2012, Clarence Joseph Opheim, 65, became the first person in the state to be released from the St. Peter hospital sex offender program. He has been living in temporary housing at Damascus Way in Golden Valley since then. Police have had no contact with Opheim there, nor have they received any phone calls about him.
Soon, Opheim will be residing in a staffed group home on Sander Dr. in the Wenonah neighborhood. The non-secure building is owned by Onkin Properties, and is operated by the Zumbro House, a program that supplies residential services for individuals needing intensive behavioral supports.
Opheim will become the fifth level III sex offender living in the 55417 zip code.
The group home is staffed 24 hours a day. Opheim will not be allowed to leave without a staff member supervising him. He will have limited internet access, and is not allowed to own a cell phone.
The Department Of Health and Human Services will supervise Opheim’s day-to-day activities and have regular face-to-face contact. His movements will be managed and monitored, and he will wear a GPS tracking unit. Transportation will be supplied as needed.
Speaking to a child or drinking alcohol violates the conditions of his release.
OPHEIM’S CRIMINAL HISTORY
Opheim spent 20 years at St. Peter. He is a sex offender who molested 29 children in the 1970s and ’80s.
According to a state document from 2011 detailing why he had been denied discharge, Opheim gained the trust of kids in his Northeast Minneapolis neighborhood by being the “neighborhood nice guy,” offering them candy and soda. His other victims were children of women he befriended in bars. There is no record of stranger-to-stranger sexual contact.
Opheim often initiated conversation with his victims that led to secluded contact at other locations, including his home.
His record indicates sex offenses against predominantly male children ranging in age from 8 to 17 years old; however, his victims also included female children. Some of these offenses involved physical harm, threats of bodily harm, the use of weapons, and the use of alcohol. In at least one instance, Opheim paid a boy between $10 and $50 for each incident to keep his mouth shut.
In addition, Opheim committed a number of non-sexual crimes that included: two counts of burglary, petty theft, aggravated criminal damage to property, aggravated forgery, criminal damage to property, breach of peace, assault, and second degree assault. During one occasion when he was 15 years old, Opheim was involved in a scuffle with his brother and friends. A knife ended up in his brother’s back, and Opheim was charged with assault.
Opheim struggles with chemical dependence, specifically with alcohol. He completed a chemical dependency treatment program in the early 1990s and remains active in Alcoholics Anonymous.
NEIGHBORHOOD MEETING HELD
A meeting regarding Opheim was held on Tuesday, Dec. 4, 2012 at Crosstown Covenant Church.
About 25 people attended, which is a much lower attendance rate than at the first Level III Sex Offender meeting held about a decade ago. Nokomis East Neighborhood Association Associate Director Doug Walter recalled that over 200 people had attended that earlier meeting at Keewaydin School regarding another sex offender. But over the years, as more sex offenders have come and gone, attendance has dropped at the community notification meetings.
The home Opheim will be residing at is now owned by Chris Onkin of Onkin Properties. “This particular program is better for the neighborhood than the tenants who lived in the building before,” noted Walter. “People are probably safer in the neighborhood now.” Because of the drug use and crime there, NENA had focused on cleaning the area up.
However, Walter is concerned about what the future might hold. The state faces a federal lawsuit by several offenders who argue that the Minnesota Sex Offender Program (MSOP) subjects them to illegal indefinite detention. If the state conducts a makeover of its program and begins releasing sex offenders, Walter is worried that more will be housed at Onkin’s two properties on Sander Dr. Onkin is also working to purchase another property nearby on 33rd.
NENA has been assured by officials that they won’t “saturate” the area. “But I don’t know exactly what that mean,” said Walter. “Even two sex offenders in this area will be a lot.”
It costs the state $120,000 a year to house each of its 600 sex offenders at the high-security St. Peter and Moose Lake facilities.
ALL SEX OFFENDERS MUST REGISTER WITH STATE
Lifetime registration is required for all sex offenders. The Minneapolis Police Department stresses that these notifications are not intended to increase fear, but instead believe that an informed public is a safer public. The Minneapolis Police Department has no legal authority to direct where a released offender may or may not live. Unless court-ordered restrictions exist, an offender may live wherever he chooses.
Sex offenders have always lived in our communities but it was not until passage of the Community Notification Bill and Sex Offender Registration Act that law enforcement knew where they were living. Due to the passage of these laws, law enforcement can now share information with the public.
According to www.minneapolismn.gov, a sex offender may be assigned a Risk Level of I, II, or III.
 An offender found to be a Risk Level I is considered the LEAST likely to re-offend.
An offender found to be a Risk Level II is thought to pose a MODERATE risk of re-offense. In this case, local law enforcement, and victims or witnesses are notified of the offenders’ release or relocation, as well as any agencies that may serve a population at risk of victimization that are located near the offenders’ home.
 An offender determined to be the MOST likely to re-offend is assigned a Risk Level III. In this case, local law enforcement, victims or witnesses, and any agencies that serve a population at risk of victimization may be notified, as well as the general public through a community meeting.

-30-

CUTLINE:
Clarence Joseph Opheim, born Aug. 15, 1947, is a white male, 5’10”, 214 pounds, with a large build, brown eyes, very short grey hair (balding) and a fair complexion.  He wears glasses.

SIDEBARS

Personal Safety Tips
FOR CHILDREN
- Assure your children that they can talk with you about questions they have about good touch versus bad touch, what to do if a stranger approaches them or if someone they know acts inappropriately towards them.

- Remind your children basic safety rules: never talk to strangers or accept rides from people you don’t know; watch out for common lures and tricks (a lost adult wanting directions, asking you to help look for a lost pet, offering you money, candy, toys in exchange for a favor, etc.).

- Teach them to use the buddy system and to listen to their instincts – if something doesn’t feel or seem right, talk to you, a teacher, or another adult they trust.

FOR ADULTS
- Keep your windows and doors locked whether you are home or not. Some break-ins happen even when you’ve just stepped outside to water your lawn or shovel snow.

- If you live in a security building, do not let in people that you do not know, even if you think you may appear impolite. Remember, if they are there for a legitimate visit, their host will let them in.

- Consider taking a personal safety class and scheduling a home security check, both of which are conducted free of charge by the Minneapolis Police Department.

- Consider joining your neighborhood block club. Neighbors that know each other are more likely to look out for one another. If no club exists, contact local Crime Prevention Specialist Sue Roethele (612-673-2839 or sue.roethele@minneapolismn.gov) for more information about starting a block club, attending a personal safety workshop, or scheduling a home security check.

From http://www.minneapolismn.gov


Facts about Sexual Violence in Minnesota

- Over 90% of all convicted sex offenders knew their victims (according to victim interviews) prior to sexually assaulting them, according to the Minnesota Department of Corrections. Contrary to popular belief, most sex offenders do not assault strangers. They look like anyone else. They are our friends, family members, and community leaders. They are most often people we know and trust.

- In Minnesota, the most common sex offense committed by those that have gone to prison is that of child molestation. The second most common is rape, followed by incest and then sexual offenses that fall into a category listed as “other” (prostitution, pornography, etc.).

- Of the over 1,300 registered sex offenders in Minneapolis, the largest number of those (subject to Risk Level assignment) are Level I’s. Level II sex offenders constitute the second largest number of offenders, with Level III’s making up the smallest number.

- Sex offenders are NOT placed in any neighborhoods in the city of Minneapolis. Once they are released from prison, they are free to live wherever they choose. Most offenders are released to the jurisdiction that originally gained conviction and is overseeing their probation. This jurisdiction cannot legally deny them residency. Offenders that want to move outside that jurisdiction must obtain permission prior to moving and may be denied residency.

Saturday, December 1, 2012

MPRB Planning Committee approves new Keewaydin master plan




by Tesha M. Christensen

The master plan for Keewaydin Park is one step closer to completion.
It was reviewed by the Minneapolis Parks and Recreation Board Planning Committee during a public hearing on Nov. 7, and unanimously approved. There were no public comments made at the hearing.
The plan will go before the full park board for action on Nov. 28.
“It’s a great amenity to that area,” stated MPRB Commissioner Carol Kummer, who represents the Nokomis neighborhood.
“Based on community feedback and insights, the plan strives to meet the park and recreation needs of youth, young adults and adults through a wading pool, playground, enhanced field design and retention of the treed area,” stated Minneapolis Parks and Recreation Board Manager of Public Engagement and Citywide Planning Jennifer Ringold.
“We are deeply appreciative of the time community members contributed to participate in this design process,” added Ringold. “The value of a master plan is that the community and MPRB have a shared vision for the future of the park.”
ABOUT THE MASTER PLAN
Parks staff and community members began meeting about Keewaydin Park shortly after the school district announced  late last year that it would be investing $16 million into the Keewaydin campus of Lake Nokomis Community School. The expansion of the school building to the south required the removal of some playground equipment. While the larger playground structure and wading pool are still in place, the park board intends to relocate them to allow for additional expansion of the school if needed in the future.
The parks department intends to move the playground and pool to the east side of the recreation building, an idea that was supported by community members. The mature trees in the area will be saved, and other items planted near the new features. Following the last community meeting in September, designers added additional screening to enhance the buffer between the neighbors across the street and the playground, noted Minneapolis Park and Recreation Board architect Deborah Bartels.
One of the key issues the parks department recognized early on was that it would not be able to fit everything in at the park site, noted Ringold. Some community members had requested that tennis courts be returned to the park, but planners weren’t able to accommodate that. However, Bossen Park is a nearby alternative.
The new playground will have a low visual impact while providing a high play value for children, Ringold told planning committee members. It will have a nature play theme with subtle colors, and a net structure.
A shade structure similar to what has been used at other parks will be installed over the pool to provide instant shade.
A highlight of the playground is a water play area that includes a hand pump, steam bed and boulders. Bartels noted that a similar feature at Lake Harriet is very popular.
The total cost of the project is $1,272,000, which includes upgrading the bathrooms in the rec center, relocating utilities, and renovating the playing fields.
The parks board has slated the Keewaydin project in its 2018 capital improvement plan.
-30-

SIDEBAR
Community members favor:
· A zero depth entry wading pool with spray feature
· A themed structure and equipment for pre-schoolers
· A farm pump and dry stream bed for water play
· A contemporary style structure with nets for elementary school-age children.

Thursday, November 1, 2012

Messenger launches new web site


Events calendar offers one-stop glimpse of community, advertisers can create synergy between print and online campaigns


by Tesha M. Christensen

Newspapers aren’t dying.
That’s the news Messenger Co-Publisher Tim Nelson wants to spread.
While the business has changed since the advent of the Internet and the nationwide recession, it is not dead but evolving, just like radio. Just like network television. Just like cable.
“It’s a very exciting time,” said Nelson.
To move forward in this digital age, the Messenger is launching a new web site. Along with an updated look, the site features a community events calendar, multimedia section, news, marketplace, classifieds, archives, and community information page.
With this update, Nelson knows things will change for the newspaper he co-owns with Calvin deRuyter. “We’re going to become a much more important resource to our community,” he said.
Messenger Editor Denis Woulfe acknowledges that this marks a whole new paradigm for the newspaper. “It’s about reinventing the business model for the industry,” said Woulfe.
A BALANCING ACT
Part of the reinvention is recognizing the myths that surround newspapers and the Internet. Senior citizens are not lost using the Internet, but regularly use it for email, shopping and more. Sure, young people might ignore the news now, but that changes when they buy a home, begin a family and start to see how it affects their lives. And while most people go online these days, not everyone has access even in urban areas. For these residents and others, the print editions continue to be their primary source of information about their community.
The new paradigm requires that newspapers find a balance between being community journalists and business people, something Nelson works to achieve every day. “We are business people first,” said Nelson. “We don’t do anyone any good if we go bankrupt.” Yet, it is the community journalism piece that marks the Messenger as a niche publication, one specifically focused on the Longfellow and Nokomis neighborhoods of Minneapolis.
SIMPLE TO ADVERTISE ONLINE
For advertisers, having an online presence on the Messenger web site is simple. Pick one of three sizes, and your ad will rotate with three others across the site. Advertisers may also opt to sponsor the events calendar. Or for higher visibility, buy the top banner ad spot or web site sponsor, and your ad will appear at the top of all the site pages.
Anyone who purchases a classified ad will continue to have double exposure for one price.
Businesses may pick from packages that include print and digital ads. “This is a great complement to the print ads they’re already doing,” said Woulfe. “The appeals and features of each are different.” With the online ad, businesses and nonprofits can do things a print ad can’t, such as provide a link directly to their own web site to boost traffic. Those who buy space in the What’s Cookin’ ad campaign get the best of both worlds: a print ad and a custom video.
FOR AND BY THE COMMUNITY
With the web site, Facebook and Twitter, “We can get more news out there in a more timely manner than before,” said Nelson.
Under the “multimedia” tab on the new web site, users can find video and photos created both by newspaper staff and readers.
One of the biggest features of the new site is its community events calendar. “It’s a one-shot glimpse of what’s going on in the area,” said Nelson.
On the calendar, readers can find detailed information on community events, from school concerts to organized bike rides. Anyone with an event can post the information using a straightforward form. After submitting an event, the online editor will review it. Events will be live within 72 hours. Nelson expects the calendar to start small and then grow as more people begin using it.
“Now getting your news in the Messenger is as easy as 1-2-3,” said Nelson.
Wolfe added, “We’re about building the community with both the print and online options.”


WHAT DOES THIS MEAN FOR THE READER?

• More news via social media
The Messenger is promoting events daily on its Facebook page and Twitter. Be sure to subscribe in order to receive updates in your news feed. Readers can also sign up for occasional email blasts.
• More news more often
While the print edition will continue to hit the newsstands just once a month, the web site will always be available.
• More exposure for community events
The Messenger has unlimited space to list the many events occurring within the Nokomis and Longfellow neighborhoods each day. Fill out a straightforward form under the “Event Calendar” tab to get your event included.
• More information on the community
Click on the “Community Information” tab for details on community organizations, schools, city offices, politicians, libraries and recreation.
• More photos and vidoes
Find videos and photo galleries on the “Multimedia” page. Content is created by not only newspaper staff, but also by you, the reader. Did you take video of a school spelling bee or church concert? Photos at a community festival? Send it to denis@deruyternelson.com.

WHAT DOES THIS MEAN FOR THE ADVERTISER?

• More synergy
It’s easier than ever to link your print ad campaign with your online ad campaign so you can benefit from both styles of advertising. Get a discount with a 12-month contract.
• More exposure
By advertising in the online Messenger Marketplace, even small businesses get regular and consistent exposure to customers who are searching for local businesses to shop at and local contractors to hire.
• More links
With your online ad, you can link readers directly to your own web site to increase your web site hits.

Sabo Bridge closed for repairs until early December






Nearest crossing at 28th a ‘mess’ during Xcel construction being completed at same time

by Tesha M. Christensen

Sabo Bridge is closed to all pedestrian and bicycle traffic until early December.
Crews are making final repairs to the five-year-old bridge, which was first closed earlier this year when a pair of suspension cables broke loose.
“We’re pleased to see the final bridge repair underway,” said Midtown Greenway Coalition Soren Jensen. “I know many people join me in hoping the repair goes smoothly and quickly.  I think the most important thing is to do it right and ensure the bridge is safe, however long it takes.”
NEW PARTS WILL WITHSTAND WIND-INDUCED FATIGUE
Diaphragm plates on the bridge’s pylon will be installed and retrofitted while the bridge is closed.  After extensive tests, Wiss, Janney, Elstner Associates, Inc., an engineering firm hired by the city, identified the cause of the cable connection failure to be wind-induced cable vibrations that caused fatigue cracking in the diaphragm plates. These plates secure the cables to the bridge’s main pylon.
According to the city, the retrofitted and replacement plates being installed are designed to withstand the fatigue that caused the cracking.
After the bridge was closed in February 2012, the broken plates were analyzed by Lehigh University in Pennsylvania. Strain gauges, displacement transducers and accelerometers installed on the bridge provided actual stress range movement, amplitude and frequency of cable vibrations experienced by the bridge during wind events. These two pieces of information presented investigators with a complete picture of what happens to the bridge in all kinds of weather. From this, the repair plan was developed.
The 215 foot-long cable-stayed suspension bridge opened in November of 2007 to carry Midtown Greenway bicycles and pedestrians over Hiawatha Avenue. The bridge was built by Hennepin County and turned over to the city of Minneapolis when construction was completed.
INTERSECTION AT 28TH A ‘MESS’
The nearest crossing to the Sabo bridge for bicyclists and pedestrians is at 28th and Hiawatha. However, that is an area of concern right now for the Midtown Greenway Coalition. Xcel has began construction there on the substation and two 115-kilovolt transmission lines that will travel 1.5 miles underground from Hiawatha to Oakland Ave. S. via 28th.
“It’s really quite a mess right now. ” observed Jensen.
He added, “Fixing the Sabo bridge is a top priority, so bicyclists and pedestrians can at least avoid most of the construction and safely cross Hiawatha/55.”
Construction of the transmission lines will be complete in the fall of 2013. The substation work will be done in 2014. The bike trails around the Hiawatha substation will remain open during the construction; however, at times the trail will be temporarily rerouted by 10 to 20 feet.
The Hiawatha Transmission Line will carry 55 megawatts of power, enough to serve 50,000 customers, and bolster existing capacity infrastructure.
Jensen encourages bikers and walkers to remain patient through the construction process. “The power company’s original idea was to place giant overhead power lines in the Midtown Greenway.  What a terrible idea! With the support of neighborhood organizations and residents along the Greenway, our coalition took the lead in the fight to keep the lines out of the Greenway -- and we won!  
“So, while the construction on 28th will disrupt things for a while, we see it as a reminder of the power of neighborhoods and citizens standing up to protect vital community assets like the Midtown Greenway.” 

Howe playground moved farther away from street


School district withdraws variance request, CUP approved


by Tesha M. Christensen

Minneapolis Public Schools (MSP) has decided to put the playground at Howe in a new location in order to avoid requesting a variance from the city.
However, the playground will still be located in the northeast side of the paved area and won’t take away from either the grassy playing field or the front lawn space.
Community members had expressed their support for the playing fields at Howe, and asked that they not be infringed upon.
The initial plan for the renovation at Howe School that was presented during a public meeting on Sept. 17, 2012 included rebuilding the playground in the same space it used to be in. However, to do that the school district needed a variance from the city because it fell within 20 feet of 44th Ave. S.
According to Howe School Project Specialist Jane Thompson, “We were advised that cost to the property owner (MPS) was not sufficient reason to grant a variance. Therefore, a revised plan for the playground area has been made.”
The size of the rubberized playground area is 50 feet by 70 feet. This is slightly smaller than the current area, but more efficient as it is rectangular in geometry, observed Thompson.
Neither the west parking lot nor the service vehicle safety zone have been compromised by the revised location of the playground.
Additionally, the school district is considering new lights that will be directed away from the property line towards the play equipment.
The change to the playground will cost the district $70-80,000 more than the first plan because the school won’t be able to reuse the existing concrete border and ground cover.
The conditional use permit for the school renovation was approved by the Minneapolis City Council on Oct. 1.
“Thank you to all that provided input at the community meeting, school meetings, by email or through your comment cards. Your voices were heard and the children will have both an athletic field and a playground with the new site plan,” said Thompson.

Keewaydin park to be challenging for kids, as well as aesthetically pleasing


Minneapolis Parks and Recreation Board architect Deborah Bartels presents
a bird’s eye view of the proposed playground and wading pool. After hearing
from residents in July that they wanted the playground design to be less
structured and more informal, Bartels worked on a redesign that would provide
those qualities. (Photo by Tesha M. Christensen)

Construction continues on Keewaydin School. A fence near the Rec Center
keeps people out of the construction site. Work will be complete in time for the
start of the 2013-14 school year. The wading pool and playground equipment
currently in place will remain there for about five years to give the park board
time to create a new playground on the southeast corner of their property.
(Photo by Tesha M. Christensen)

This draft of the Keewaydin Park Master Plan will be presented to the park
board during a public hearing on Nov. 7. The highlight of the plan is a
water element between the pre-K and K-12 play structures. It will include a
sandbox, pump, dry stream bed with boulders and various concrete walls
that will also serve as benches.

New master plan incorporates net structure and natural color palate

by Tesha M. Christensen

Keewaydin parents want a playground that is challenging and has a high play value. Next door neighbors want one with a calming view.
The Rec Plus Kids showed the parks department how to merge the two.
According to Minneapolis Parks and Recreation Board Manager of Public Engagement and Citywide Planning Jennifer Ringold, when the Rec Plus Kids voted on what they want to see in a playground, the majority favored a nature play area over either the classic post and deck or one with all nets (20 to 4).
“We’re really thankful for the kids because I think they showed us the way in how to merge the concepts,” stated Ringold during a community meeting held on Sept. 25, 2012.
When the parks department requests playground manufacturers to submit proposals for Keewaydin Park, they will be told there is a preference for an Evos/net structure with a color palate that mimics nature and uses browns, greens and blues.
DETAILS AND COST
 The September meeting was the fourth one held this year to update the Keewaydin Park Master Plan. Driving the effort is the $16 million expansion of Keewaydin School that will eventually displace the existing playground and wading pool. While a section of the playground has already been removed, the majority of the equipment will remain for five more years in the existing location, which gives the Minneapolis Parks Department time to find funding to move the playground and pool from the west side of the parks building to the east side.
At the July meeting, residents expressed their support for the location on the east side of the parks building, but wanted the playground design to be more informal, noted Minneapolis Park and Recreation Board architect Deborah Bartels.
The revised plan has a smaller footprint, “but the play value is the same,” said Ringold.
It places the K-12 structure with swings closest to 31st Ave. on the south side. In between it and the pre-k structure is a water element shaded by a pergola. In this area will be a sandbox, pump, dry stream bed with boulders, and various concrete walls that will also serve as benches. Three spinners and six swings from the old playground will be reused. The new play equipment will cost $233,550.
The wading pool nearby will have a spray feature. There will be numerous benches around it, and park staff members are researching what the best sort of shade structure will be. The cost of the wading pool is $404,500.
Since the last meeting, park staff did learn that they do not need to include bathrooms in the pool equipment building. Instead, the bathrooms in the main park building will be remolded to be accessible from outside and to be ADA accessible. It will cost about $25,000 to renovate the existing rec center bathrooms.
The parks department will also spend about $41,000 to relocate utilities.
Five additional trees will be planted around the playground, and the existing trees will be preserved.
An ornamental fence will be installed around the perimeter of the playground and the pool as the city requires anything within 100 feet of a street to be fenced. The space near the fence will be left clear of vegetation so that the sight line into the area is clear. “We like to keep the view into parks pretty open to reduce vandalism,” stated Bartels.
The total cost of the project is $992,422. That doesn’t include the cost of renovating the playing fields, which will range from $170,000 to $275,000.
Construction will be phased so that the existing playground and wading pool remain in use until the new ones are ready. Keewaydin parent and school construction steering committee member Matt Lee pointed out the school changed its plans in order to accommodate the playground and pool.
Before anything is built, the city needs to identify funding for the project.
COMMUNITY COMMENTS
Neighborhood resident Cheryl Luger stated, “I love the pool and pergola. It looks very well designed.”
In response to a question from the audience, Ringold noted that the parks department conducted a parking analysis earlier this year. The conclusion was that there is adequate on-street parking to meet the needs of the playground, pool and athletic fields.
The primary entrance into the playground/pool area will be on the northwest side to encourage patrons to park away from the corner of 53rd St. and 31st Ave.
Park staff re-visted the rational behind removing two ball fields and creating two soccer fields in their place. Bartels explained that it is difficult to play soccer in the ag lime of a ball field. When local sports groups were surveyed, they stated that the need was for soccer fields, not ball fields.
WHAT IS THE NEXT STEP?
The draft of the master plan will be viewed by the park board at a public hearing on Wednesday, Nov. 7. Residents will be given one to three minutes to speak. Then the park board will consider approving it. Once approved, the parks department will begin to identify funding for the work.

Monday, October 1, 2012

Where will playground go at Howe?

Katie Bicek and Robb Luckow review plans for the renovation of Howe
School during a community meeting on Monday, Sept. 17. Both have children
who will be attending Howe next year as third graders. (Photo by
Tesha M. Christensen)

This graph provides details of the Howe renovation project. Construction
will begin in January and it will be completed by August 2013 in time for
the start of the 2013-14 school year.

Community members debate pros and cons of rebuilding playground at existing location

by Tesha M. Christensen

Where should the playground at Howe School be located?
That was the subject of debate during an informational meeting on the Howe project held on Sept. 17, 2012 at Hiawatha River Community School.
Right now the school district plans to rebuild the playground exactly where it was before, behind the school building next to 43rd Ave. The playground was ripped out a few years ago while the school sat empty and the district contemplated selling it.
However, rebuilding it will require a variance from the city, which requires a 20-foot setback from the street.
Paul Mays of Miller Dunwiddie  Architecture explained that the curbing around the old playground still remains. Replacing that and performing the needed ground work would cost an estimated $40-50,000.
“We’re trying to take advantage of the concrete border,” said Clyde Kane, Minneapolis Public School (MPS) manager of design and construction. “If it goes someplace else, we will be hardpressed to find the budget to move it.” The total budget for the project (including construction, architect fees and other “soft costs”) is $8 million.
By adhering to the city’s setback, the school would lose roughly half the playground space.
There is also space set aside in the back of the school building for hard surface play such as hopscotch and four square. On the east side will be an employee parking lot, an enclosed trash area, and space for delivery trucks.
In the current plan, the green space for the soccer/ball fields remains as is.
Some attendees at the Sept. 17 meeting voiced their support for retaining the playing fields as they are and rebuilding the playground where it was. A few pointed out that the soccer field is used by not only school teams, but community ones, as well. “The need for fields in the community is very strong,” noted MSP Area B Community Liaison Kristen Berg Thompson.
Other community members expressed concern about the playground, and how it is used outside school hours.
“We’re not trying to talk against building the playground. We want to see good management,” said Rolf Almquist, who lives across the street from the proposed playground location. He suggested that security cameras be installed, and a management plan created by the school district.
The playground location will be evaluated by the Minneapolis Planning Commission during a public hearing on Oct. 1. Also at that time the commission will review the conditional use permit requested by the school district for the renovation. 
The permit process is required because the district is remodeling a school building that was closed, explained Kane.
RENOVATION DETAILS
After being closed in 2005, Howe will reopen for the 2013-14 school year as a dual campus with Hiawatha. Hiawatha will house the younger grades, and Howe will take third, fourth and fifth graders.
There will be a total of 16 classrooms in the reopened Howe building, according to May. The maximum capacity for the school will be 285 students, and in the first year it will start with between 150 and 180.
There will be three third-grade classes, two fourth-grade classes and two fifth-grade classes, pointed out Hiawatha Principal Deb Regnier.
The classrooms at Howe will solve the space crunch at Hiawatha. Until then, Hiawatha lacks enough classrooms, according to Regnier.
Right now, there is a split class with both fourth and fifth graders, and the school has implemented “Art on a Cart” in order to accommodate an additional kindergarten class.
“We are packed to the gills here,” said Regnier. This is a year of transition before the space issues are resolved, she added.
Before Howe is reopened, the guts of the school will be reinvigorated, according to May. “We are bringing this school into the 21st century,” he said.
Air conditioning will be installed, along with a new HVAC system and electrical system. More insulation, new windows and a new roof will make the school more energy-efficient, as will new lighting. All of the flooring and finishes in the building will be replaced and repainted.
The stormwater and sanitary sewer will be now be separated so that the stormwater can be filtered on site. This sustainable system will be installed in the southwest corner of the property. Once the tanks are buried, the area will be resodded.
White boards, smart boards, projectors and computers will be placed in each classroom. Howe will match Hiawatha in several ways, including the designation of “learning zones” defined by flooring.
“We have been on a long journey with Howe school. Everyone is very excited to see it opening again,” stated Minneapolis Council Member Sandy Colvin Roy.
“We are going to need your support through the whole program,” Kane told community members and parents.