Showing posts with label lightrail. Show all posts
Showing posts with label lightrail. Show all posts

Wednesday, September 27, 2017

New office, retail building next to 38th St. lightrail station clearing hurdles for construction


The Lander Group’s plan to revitalize 38th St. station includes three new buildings, two plazas, new city street, additional stoplight, and bike parking

by Tesha M. Christensen


While the proposal for multi-story buildings at the 38th St. and Hiawatha fits within the city’s plans for development along the lightrail line, neighbors argue that it doesn’t fit within their South Minneapolis neighborhood.
During a public hearing on Sept. 18, 2017, Jennifer Halter, a resident along 29th Ave., pointed out that most of the buildings in the neighborhood are one-and-a-half story bungalows or two-story homes.
She specifically opposes the plan by the developer, Lander Group, to put a four-story building on the southeast corner of 38th St. and 29th Ave.
“A four-story building has no business on the south block of 38th St. if the city and developer intends to retain the character of the neighborhood,” wrote Halter in a letter opposing the proposal.
The proposal shows a building that is two stories along 38th and steps back to four stories on the south side, which means that the 100-year-old, 1.5-story farmhouse on the south will be right next to a four-story wall without a setback, Halter said.
Halter was joined by two other neighbors who are also concerned about the size of the building proposed for the south side of 38th, parking issues along the residential streets, and the traffic congestion that will be generated by the new development.
“People want their cars. They don’t want to go grocery shopping in January on the bus,” stated Caroline Smart.
Yvette Roberts, who lives north of 38th along 29th Ave., is also concerned about traffic, specifically the buses that will be traveling down her street, and she’s a regular bus rider who doesn’t own a car. She also expressed concern about where cars were going to park. “Everyone wants to park by the lightrail station. They want a park and ride,” she stated.

STATION TO BE COMPLETELY REDONE
The Lander Group is planning to revitalize the 38th St. Lightrail station through “through privately-led, publicly-visioned development,” according to city documents. By making the site larger through the purchase of the six homes on the west side of the property along 29th, the Lander Group will enlarge the bus turnaround and drop-off, create a new city street, add two new station plazas with public art and water features, and construct three new buildings.
The buildings will house a mixture of office, retail and housing.
A GREAT STREET
While neighbors spoke about the overall development during the Sept. 18 public hearing, Planning Commissioners were looking at just a portion of the project. 
“We’re excited to be here,” said Michael Lander of Lander Group. “One could argue this is the culmination of a vision that started 27 years ago.” The vision for lightrail along this corridor included redevelopment of the area with high-density housing along the line and additional amenities.
“There’s been a lot of people talking about what they want to happen, and we’re excited to make it happen,” Lander stated.
The Lander Group envisions a “great street” from its soon-to-be complete project at 38th and 28th east to Hiawatha. They intend to invest in streetscaping improvements along the corridor. The new city street within the development, the extension of 30th Ave., will be a full city street and not merely the bus lane that is there now and it will have broad sidewalks.
One of the highlights of the site for the public is a 100 by 40-foot plaza along 38th and the lightrail line. This will be a privately-owned public space with sidewalks along the edge, seating, planters, and a water feature within 20 feet of what developers hope will be a restaurant.
The public improvements will be 100% financed and paid for by new resources directly from the project - new property taxes, a Hennepin County TOD grant, and a Met Transit Livable Communities TOD grant.
Due to the large scale of what they’re proposing, The Lander Group broke things up and asked first for approval of the plaza and “building 2,” the 10,000-square-foot structure next to the lightrail line.
The aim of building two is to welcome visitors to the Standish neighborhood with an upward sweeping grand roofline and large glass atrium. The unique wedge-shaped building will hold office and retail space in three levels, two above grade and one below. A classic modern design with brick and glass will be used, and the plan calls for a large mural facing the lightrail tracks.
To move the project forward, the planning commission reviewed a rezoning request (to C3A Community Activity Center District), a conditional use permit for a planned unit development, and two variance requests. The variance requests were deemed unnecessary due to varying interpretations, and the others approved by the planning commission.
B
While the design includes windows on all sides of building two, due to how city staff calculate the window requirement they concluded that the building had only 9% of the required 40% windows. Unless the window began at two feet, it was not counted at all in the calculation.
Lander Group staff argued that the plan calls for windows beginning at three feet as the use on that level will be by a restaurant and they wanted more flexibility in where to position chairs than a two-foot window would allow.
Lander Group staff also questioned the city staff desire to have 25% of the seating with backs in the plaza be stationary, and argued that non-stationary seating would be better suited for the plaza.
Commissioners agreed.
BUSES WILL TRAVEL IN LOOP AROUND 30TH AND 29TH
The new plan for the station brings buses and traffic in at the existing location, which will be the new 30th Ave., west to 29th, and south down 29th. Four bus bays will be created to make boarding more efficient. Parking will be removed entirely on the west side of the 32-foot-wide street south of its intersection with the new east-west street to accommodate the bus traffic and ensure buses aren’t operating net to parked cars. Five parking spots on the east side will also be removed, adding up to a total loss of 20 parking spaces along 29th.
At its intersection with 38th Street, 29th Ave. will be widened to a three-lane section with a southbound through and left turn lane, and a right-turn only lane. A new stoplight will also be erected there.
Following a traffic study, planners believe that traffic will be better with these changes. Currently, the transit driveway and stoplight is less than 200 feet from the intersection of 38th and Hiawatha. The additional distance should provide longer and more discernable gaps in traffic.
Presently, there are about 4,600 weekday daily trips into and out of the station area. About 2,200 passenger trips arrive to board transit per weekday with about 1,600 of those attributed to the Hiawatha Blue Line and about 600 boardings per day occurring on the three bus routes. About 28% of LRT boardings access the station from buses, so about 75% of bus activity at the station is related to transferring to and from the LRT.
THREE NEW BUILDINGS IN ALL
Buildings one and three will come before the planning commission “soon,” according the Lander.
Building one will anchor the new development as a mixed-use structure and replace the existing single-family homes on the east side of 29th. Street-level retail space at building one will be divided into three individual bays, totaling over 8,000 square feet. Interaction between the new five-story building and the existing Cardinal Bar building will create new pedestrian zones that will encourage socializing, rest, and outdoor dining opportunities. Housing units (135 in total) will sit above the retail base and surround a central open courtyard.
There will be 109 underground and 85 at-grade parking spaces for residents, employees, and longer term parkers. Access will be from 29th Street and the new bus turnaround street. Besides providing ground level parking, the central courtyard water infiltration system will filter rainwater runoff through a landscaped area before releasing it into the city system.
Solar panels on Building One will offset energy use and residential areas will include recycling receptacles on each floor.
To the south of 38th Street, the new mixed-use building three will have over 2,700 square feet of street-level retail space facing 38th St. The 24 market rate affordable units will provide a mix of studios and two-bedroom floor plans. Fourteen spaces of off-street parking will be available for tenant use.
According to documents filed with the city, planners envision 38th Street Station becoming a hub of alternative transportation options, supporting light rail with bicycle storage options, dedicated shared vehicle spaces, and encouraging a walkable neighborhood.

 This article appeared in the October 2017 edition of the Longfellow-Nokomis Messenger. 

Saturday, February 1, 2014

Local man killed by light rail train at 42nd St.


by Tesha M. Christensen

An Ericsson resident became the 10th person to die after being struck by a light rail train in Minnesota.
The Blue Line along Hiawatha Ave. opened 10 years ago in June 2004.
According to John Siqveland of Metro Transit, Michael F. Kwosek, 62, was walking westbound on the southern side of the gated intersection at 42nd St. when he was struck by the braking southbound train at about 6 p.m. on Sunday, Jan. 12, 2014.
Kwosek was six blocks from his home on the 4200 block of 30th Ave. S.
The gate arms controlling the intersection were in the lowered position, and the train came to a stop a short distance beyond the intersection after striking the man.
The light rail line was closed and buses were brought in to transport rail passengers between Franklin and Fort Snelling stations until about 7:50 p.m.
According to Siqveland, of 10 fatal accidents since the Blue Line opened, five have involved pedestrians; four have involved motorists; and one has involved a bicyclist.
“This is the only pedestrian accident at this location,” stated Siqveland. “In September of 2004, motorist Hilmer Iverson, 87, drove through a gate arm at this intersection and his automobile was struck by a southbound train.”
Metro Transit Police, as well as Metro Transit’s Rail Safety division, are investigating the incident.
LIGHT RAIL VS. AUTOS
“Fatalities and crashes in this mode of transportation are rare, but they do happen,” observed Mantill Williams of the American Public Transportation Association. “There’s no mode of transportation that is risk free.”
According to the U.S. Department of Transportation, fatalities on light rail lines over the last 15 years has ranged from a low of 13 in 2002 to a high of 33 in 2009.
There are 27 light rail lines in United States, and several get added every year, according to American Public Transportation Association Director of Policy Development and Research Darnell Grisdy.
He pointed out that the vast majority of deaths on light rails lines are suicides.
In comparison, 40,000 people a year died in automobile deaths, said Grisdy.
“It’s the safest mode of travel,” Grisdy remarked.


This story appeared in the February 2014 edition of the Longfellow/Nokomis Messenger.

Thursday, September 12, 2013

Metro Transit Police Department reinvents itself


Under chief John Harrington, department to add beat cops at light rail stations

Photo by Stefanie Ferres

by Tesha M. Christensen

When the lightrail line on University Ave. opens next year, there will be 15 Metro Transit Police Officers patrolling it.
The officers will do more than ride the trains and check fares. They will also actively patrol the stations and work to build relationships with riders.
According to Metro Transit Police Department Chief John Harrington, ridership studies have shown that people feel the most at risk when they are on a platform waiting for a train or bus transfer.
Since assuming leadership of Metro Transit’s police officers a year ago, Harrington has worked to change the philosophy of the department, and with that address 85 recommendations for change made by the Upper Midwest Community Policing Institute before his tenure. He doesn’t want to see officers merely react to crime when it happens. He wants them to help prevent it by operating as neighborhood beat cops.
OFFICERS ADDED
To accomplish that goal, he has been adding more staff.
“I fundamentally believe that when I got here, the department was understaffed,” said Harrington, whose background is in community policing.
In the last year, Metro Transit has added administrators, supervisors and officers. There were 22 new part-time officers added in April 2013, and 19 full-time in August. Another 26 part-time officers will join the ranks this fall.
In the hires, Harrington has sought to create a department that reflects the communities it serves. When he was chief of the St. Paul Police Department, he sought to ensure that 20% of officers were people of color and/or women. He hopes to reach that goal again while at Metro Transit. Of those hired in August, half were people of color, and several were multi-lingual, Harrington observed. He pointed out that 100 foreign languages are spoken within the Metro Transit area.
“We have a lot of work to do until the department is truly reflective,” Harringson said. “This is just the beginning.”
The cost of each officer is $93,000 per year (salary, benefits and supplies). Metro Transit Police Department’s total budget in 2013 is roughly $12.41 million.
There are currently 12 officers dedicated to the Hiawatha Blue Line, a number that isn’t enough staff for a beat cop system. Harrington hopes to bump that up and has asked for an increase in his 2014 budget to do so.
The two most common crimes on lightrail are disorderly conduct and the theft of electronics and backpacks, both on and off the train, noted Harrington.
Each day, 260,000 people hop on a Metro Transit bus and train. When there’s a problem, officers average a 2 minutes or less response time.
CHALLENGES OF A MOVING SYSTEM
The 83 full-time Metro Transit police officers cover the second biggest jurisdiction in the state, one that stretches over 8 counties, 90 cities, 3,246 square miles and 3 million people.
The size comes with its set of challenges, one Harrington believes only a department dedicated to transit can handle. He pointed out that the crimes Metro Transit deals with don’t fit easily in one geographic space, which makes it tough for city police departments to handle. For instance, a bus might start out from St. Paul and end in Minneapolis. The victim might live in Brooklyn Center and the witnesses spread throughout several other cities. So, whose job is it to handle, who does the follow-up and who pays for it?
Metro Transit’s Police Department was created 20 years ago in acknowledgement of those problems, pointed out Harrington. “We are unique,” he said.
That’s not to say Metro Transit works alone. Rather, the department partners with many other organizations. Harrington is currently working to establish formal memorandums of understanding with the many cities and other entities (such as the University of Minnesota) in their jurisdiction to clearly outline who handles what. His goal is that each group “share information so that investigations can be seamless and the perpetrator brought to justice,” Harrington remarked.
PAST EXPERIENCE A BOON
To accomplish this task, Harrington is relying on the relationships and colleagues from his 30 years with the St. Paul Police Department, six of which he spent as chief there. He believes that the trust he has built over up his career is a boon to him in his position with Metro Transit.
From his time as senator, Harrington has brought a broad view of problem solving.
“The legislature prompted me to look at things from a regional perspective,” Harrington stated.
The mission of Metro Transit is to be a safe, cost-effective and efficient provider of transit throughout the metro area.
Since he came on board in September 2012, Harrington the role of metro transit has shifted and changed alot, Harrington pointed out. “We’ve pretty much reinvented ourselves,” he noted.
“This year we’ll go through another reinvention.”

This story was printed in the September 2013 edition of the St. Paul Monitor.