Showing posts with label Minneapolis 28th Ave. and 38th St.. Show all posts
Showing posts with label Minneapolis 28th Ave. and 38th St.. Show all posts

Wednesday, September 27, 2017

New office, retail building next to 38th St. lightrail station clearing hurdles for construction


The Lander Group’s plan to revitalize 38th St. station includes three new buildings, two plazas, new city street, additional stoplight, and bike parking

by Tesha M. Christensen


While the proposal for multi-story buildings at the 38th St. and Hiawatha fits within the city’s plans for development along the lightrail line, neighbors argue that it doesn’t fit within their South Minneapolis neighborhood.
During a public hearing on Sept. 18, 2017, Jennifer Halter, a resident along 29th Ave., pointed out that most of the buildings in the neighborhood are one-and-a-half story bungalows or two-story homes.
She specifically opposes the plan by the developer, Lander Group, to put a four-story building on the southeast corner of 38th St. and 29th Ave.
“A four-story building has no business on the south block of 38th St. if the city and developer intends to retain the character of the neighborhood,” wrote Halter in a letter opposing the proposal.
The proposal shows a building that is two stories along 38th and steps back to four stories on the south side, which means that the 100-year-old, 1.5-story farmhouse on the south will be right next to a four-story wall without a setback, Halter said.
Halter was joined by two other neighbors who are also concerned about the size of the building proposed for the south side of 38th, parking issues along the residential streets, and the traffic congestion that will be generated by the new development.
“People want their cars. They don’t want to go grocery shopping in January on the bus,” stated Caroline Smart.
Yvette Roberts, who lives north of 38th along 29th Ave., is also concerned about traffic, specifically the buses that will be traveling down her street, and she’s a regular bus rider who doesn’t own a car. She also expressed concern about where cars were going to park. “Everyone wants to park by the lightrail station. They want a park and ride,” she stated.

STATION TO BE COMPLETELY REDONE
The Lander Group is planning to revitalize the 38th St. Lightrail station through “through privately-led, publicly-visioned development,” according to city documents. By making the site larger through the purchase of the six homes on the west side of the property along 29th, the Lander Group will enlarge the bus turnaround and drop-off, create a new city street, add two new station plazas with public art and water features, and construct three new buildings.
The buildings will house a mixture of office, retail and housing.
A GREAT STREET
While neighbors spoke about the overall development during the Sept. 18 public hearing, Planning Commissioners were looking at just a portion of the project. 
“We’re excited to be here,” said Michael Lander of Lander Group. “One could argue this is the culmination of a vision that started 27 years ago.” The vision for lightrail along this corridor included redevelopment of the area with high-density housing along the line and additional amenities.
“There’s been a lot of people talking about what they want to happen, and we’re excited to make it happen,” Lander stated.
The Lander Group envisions a “great street” from its soon-to-be complete project at 38th and 28th east to Hiawatha. They intend to invest in streetscaping improvements along the corridor. The new city street within the development, the extension of 30th Ave., will be a full city street and not merely the bus lane that is there now and it will have broad sidewalks.
One of the highlights of the site for the public is a 100 by 40-foot plaza along 38th and the lightrail line. This will be a privately-owned public space with sidewalks along the edge, seating, planters, and a water feature within 20 feet of what developers hope will be a restaurant.
The public improvements will be 100% financed and paid for by new resources directly from the project - new property taxes, a Hennepin County TOD grant, and a Met Transit Livable Communities TOD grant.
Due to the large scale of what they’re proposing, The Lander Group broke things up and asked first for approval of the plaza and “building 2,” the 10,000-square-foot structure next to the lightrail line.
The aim of building two is to welcome visitors to the Standish neighborhood with an upward sweeping grand roofline and large glass atrium. The unique wedge-shaped building will hold office and retail space in three levels, two above grade and one below. A classic modern design with brick and glass will be used, and the plan calls for a large mural facing the lightrail tracks.
To move the project forward, the planning commission reviewed a rezoning request (to C3A Community Activity Center District), a conditional use permit for a planned unit development, and two variance requests. The variance requests were deemed unnecessary due to varying interpretations, and the others approved by the planning commission.
B
While the design includes windows on all sides of building two, due to how city staff calculate the window requirement they concluded that the building had only 9% of the required 40% windows. Unless the window began at two feet, it was not counted at all in the calculation.
Lander Group staff argued that the plan calls for windows beginning at three feet as the use on that level will be by a restaurant and they wanted more flexibility in where to position chairs than a two-foot window would allow.
Lander Group staff also questioned the city staff desire to have 25% of the seating with backs in the plaza be stationary, and argued that non-stationary seating would be better suited for the plaza.
Commissioners agreed.
BUSES WILL TRAVEL IN LOOP AROUND 30TH AND 29TH
The new plan for the station brings buses and traffic in at the existing location, which will be the new 30th Ave., west to 29th, and south down 29th. Four bus bays will be created to make boarding more efficient. Parking will be removed entirely on the west side of the 32-foot-wide street south of its intersection with the new east-west street to accommodate the bus traffic and ensure buses aren’t operating net to parked cars. Five parking spots on the east side will also be removed, adding up to a total loss of 20 parking spaces along 29th.
At its intersection with 38th Street, 29th Ave. will be widened to a three-lane section with a southbound through and left turn lane, and a right-turn only lane. A new stoplight will also be erected there.
Following a traffic study, planners believe that traffic will be better with these changes. Currently, the transit driveway and stoplight is less than 200 feet from the intersection of 38th and Hiawatha. The additional distance should provide longer and more discernable gaps in traffic.
Presently, there are about 4,600 weekday daily trips into and out of the station area. About 2,200 passenger trips arrive to board transit per weekday with about 1,600 of those attributed to the Hiawatha Blue Line and about 600 boardings per day occurring on the three bus routes. About 28% of LRT boardings access the station from buses, so about 75% of bus activity at the station is related to transferring to and from the LRT.
THREE NEW BUILDINGS IN ALL
Buildings one and three will come before the planning commission “soon,” according the Lander.
Building one will anchor the new development as a mixed-use structure and replace the existing single-family homes on the east side of 29th. Street-level retail space at building one will be divided into three individual bays, totaling over 8,000 square feet. Interaction between the new five-story building and the existing Cardinal Bar building will create new pedestrian zones that will encourage socializing, rest, and outdoor dining opportunities. Housing units (135 in total) will sit above the retail base and surround a central open courtyard.
There will be 109 underground and 85 at-grade parking spaces for residents, employees, and longer term parkers. Access will be from 29th Street and the new bus turnaround street. Besides providing ground level parking, the central courtyard water infiltration system will filter rainwater runoff through a landscaped area before releasing it into the city system.
Solar panels on Building One will offset energy use and residential areas will include recycling receptacles on each floor.
To the south of 38th Street, the new mixed-use building three will have over 2,700 square feet of street-level retail space facing 38th St. The 24 market rate affordable units will provide a mix of studios and two-bedroom floor plans. Fourteen spaces of off-street parking will be available for tenant use.
According to documents filed with the city, planners envision 38th Street Station becoming a hub of alternative transportation options, supporting light rail with bicycle storage options, dedicated shared vehicle spaces, and encouraging a walkable neighborhood.

 This article appeared in the October 2017 edition of the Longfellow-Nokomis Messenger. 

Monday, October 31, 2016

Potential along 38th St. being tapped

Ground breaks for 3828 housing, retail; first phase will open next fall

By TESHA M. CHRISTENSEN
Ground broke on Wed, Oct. 19, for the first of several buildings that will reshape 38th Ave. west of the light rail station. Calling it the first step, community leaders praised the vision of the project and the way it will fit into the neighborhood.
img_4845groundbreaking3828sm
Ground broke for the 3828 project at the southwest corner of 38th St. and 28th Ave. on Wed., Oct. 19. Left to right: County Commissioner Peter McLaughlin, Standish-Ericsson Neighborhood Association Board President Molly McCartney, Ward 12 Council Member Andrew Johnson, Lander Group President Michael Lander, Andrew Moeding of the Lander Group, and Andy Root of Forteva Real Estate and Solar. (Photo by Tesha M. Christensen)
The new building at the southwest corner of 38th St. and 28th Ave. will wrap around the existing streetcar commercial building owned by Forteva, and will include 51 market-rate apartments and four retail spaces. The new building will replace surface parking, a tiny service garage, a one-story concrete block building and a duplex on portions of four properties.
img_4839petermichaelsm
County Commissioner Peter McLaughlin (left) and Lander Group President Michael Lander talk about how development has followed the light rail line in south Minneapolis. (Photo by Tesha M. Christensen)
The commercial space will face 38th St., and ground floor residential units will face 28th Ave. Forteva will be incorporating a solar installation, an electric car (EV) charging station, and perhaps an electric Car To Go.
There will be 34 new off-street parking stalls screened from the road that will be used for resident and business parking. Construction will take between 12 to 14 months. Viewed as a transit-oriented project, developer Michael Lander of Lander Group pointed out that the plan for the site matches the SENA neighborhood plan developed in 2007. “Lander Group never met a parking lot it didn’t want to build on,” commented Lander.
During the groundbreaking ceremony, County Commissioner Peter McLaughlin recalled, “They laughed at us 20 years ago when we said there would be development along the light rail lines. …The energy around light rail has been incredible. I’m very excited we’re going to see investment here at this corner.”
This is the first of several buildings being planned by the Lander Group for the stretch east from the light rail station that will “transform” the area, according to Council Member Andrew Johnson. “Great things are happening here,” Johnson stated.
site-plan-38th-vmwp
The project at the corner of 28th and 38th is the first planned by the Lander Group, and will be followed by work near the light rail station at 38th and Hiawatha Ave. Work at the light rail station will include several buildings housing housing and retail. It will likely be done in phases and could begin as soon as fall 2017. (Photo by Tesha M. Christensen)
Six houses along 29th will come down within the next few years to make way for several planned buildings at the 38th Street light rail station, as well as allow buses access to 29th. A five-story apartment building will wrap around The Cardinal, and along the light rail line, there will be a two-story retail and office structure. Across the street, the intent is to replace one house and the Cardinal parking lot with a four-story mixed-use housing building. Included in the plan are a courtyard and parking area.
Lander pointed out that the demographics of the neighborhood had changed over the past 25 years when 75 percent of homes had children in them. Today, just 25 percent of homes have children, which changes the type of housing citizens are looking for.
The Lander Group envisions its retail as an amenity to those who live in the building, and seek out unique and out-of-the-box businesses. There may be a shared kitchen in one area to help several businesses with the large cost of kitchens, for example. Anyone with ideas on businesses for the area is encouraged to contact Andy Root of Forteva at 612-414-6113 or aroot@forteva.com.

This article appeared in the November 2016 Longfellow/Nokomis Messenger.

Thursday, March 6, 2014

NEIGHBORHOOD NOTES | Plan a tea party at A Cupcake Social

 
 
The corner at 28th Ave. and 38th St. is a popular destination these days. Last fall, Keen Coffee opened on the southwest corner, filling the space vacated by Tillie’s Bean. And in late December, A Cupcake Social, a gourmet cupcake boutique, opened across from Northbound Smokehouse and Brewpub.

With its fancy lighting and unique chairs, A Cupcake Social sets the perfect mood for a tea party. Or shower. Or birthday party. Or meeting. Set up a time for diminutive would-be pastry chefs to decorate their own cupcakes and enjoy a cupcake to eat at the party.

One table is perfect for those pint-sized ones in your life. And there’s a play kitchen right next to it to keep the little ones occupied while you enjoy a cup of tea and a decadent cupcake.

With flavors like Red Velvet, Death by Chocolate, Hawaiian Dream, Samoa, Dreamsicle, Oh Joy! and Pistachio Chocolate, you might be standing at the counter awhile. They also offer several gluten-free options. Over 50 flavors rotate weekly. Sweet treats start at $2.79 for a cupcake and $3.49 for a chocolate croissant. They also offer homemade ice cream.

A Cupcake Social stocks teas from TeaSource. Cups are $3.49, or opt for chai at $3.89.

Owners Jess Stone and Suzette Herr have been selling cupcakes from a food truck for the past three years, and will continue to operate the truck during the summer months. Why did they open a brick and mortar location? The number one question they got from customers was “Where is your store?” Realizing there was a demand for their products beyond the food truck, they decided to give their customers what they wanted, when they want it.

The shop offers a series of workshops such as Pinterest crafts, jewelry making, painting and other variety of arts. All classes include supplies (unless otherwise specified), coffee/tea and a gourmet cupcake. No stuffy classrooms, just an intimate, relaxing space to work. Classes are limited to 10 participants.

On Tuesday, April 10 at 7 p.m. place a dip pen to paper and learn to craft your own distictive lettering style under the guidance of lettering artist Crystal Kluge. This 3-part class will cover the basics to help release your inner calligrapher. It will focus on expressive pointed pen lettering using a variety of inks. Supplies will be provided; however, students are welcome to bring their own pens and inks or paper materials if they wish. To provide ample attention to each student in an intimate studio setting, this class is limited to 10 students. Register on the web site.

Get cupcakes regularly by signing up for the cupcake membership packages.

A Cupcake Social delivers to the Minneapolis and St.Paul areas. The delivery fee is $9.95, and the minimum order for delivery is one dozen cupcakes (of the same flavor).

Address: 3800 28th Ave S, Minneapolis, MN 55406
Phone: (651) 243-1114
Hours: Mon-Thurs 8am-6pm, Friday 8am-8pm, Saturday 9am-8pm, Sunday Closed